Options – Acton

Screen Shot 2016-07-01 at 13.04.30The Options data centre is one of a cluster of data centres in Acton (click on map to open in Google maps). It stand just north of the Powergate business park, which is home to Telecity Powergate 1Telecity Powergate 2 and Colt Powergate.

Directly opposite the national grid substation (below), and alongside the Grand Union Canal, a handy reminder that often the internet follows (or mirrors) existing infrastructure.

IMG_6654

This relatively small data centre opened in 2008. According to colo-x Options decided to locate here due to “access to fibre, power and good transport links to central London (Barkerloo line at Harlesden Station giving 35 minutes access to Piccadilly Station), or 18 minutes to Euston via overground”. Again expressing the importance of physical infrastructure.

 

IMG_6658

IMG_6676

More than any other data centre I have visited so far, this building has a extremely visible security presence. Along with high fences topped with barbed wire the building has numerous security cameras and a huge number of warning signs. There are also concrete bollards to stop ram raiding and floodlights all around the building.

IMG_6662

IMG_6664

IMG_6666

IMG_6668

IMG_6667IMG_6660

IMG_6670

IMG_6673

IMG_6659

 

 

 

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s